To speed up the implementation of WiFi in the coaches of its TGVs, SNCF was looking for a workshop solution that could be implemented very quickly and that met specific technical requirements, while taking into account the curvature of the tracks to the millimetre.

Maintenance workshop
Maintenance workshop
Maintenance workshop
Maintenance workshop
1/4

On a congested site and with staggered work schedules, in just two days our teams assembled two Neivalu juxtaposed double-gantry buildings with a length of 130m. A major assembly constraint was to respect the spacing and the curvature of the tracks, as well as the necessary distances with respect to the overhead lines.

Spaciotempo provided a solution adapted to the configuration of the site and the expected use of the building by juxtaposing two Neivalu buildings, the first of 12m x 65m x 6m and the second 15m x 65m x 6m, thus offering over 1,700m² of workshop space while meeting the comfort and safety needs of SNCF employees. The buildings were equipped with compressed roofs, insulated cladding and a heating system.

Thanks to our experience on complex construction sites, we were able to meet the needs of our customer in a short time, advising them in the pre-project phase, and by closely controlling our supply chain.